LogoBuildingInspect
Mid-Rise Residential Inspection
0+

Units Inspected

0

Buildings Cleared

0%

Deficiency Detection Rate

We find what the builder left behind.

Documenting hairline slab cracks, HVAC riser deficiencies, and waterproofing failures in 5–12 story residential buildings before they escalate into seven-figure lawsuits.

Structural Envelope·Mechanical Risers·Roofing Membrane·Parking Deck·Fire Suppression·Elevator Compliance·Waterproofing Systems·Balcony Threshold·Slab Integrity·
Scope of Inspection

Every system. Every floor.
No assumption left undocumented.

Cards alternate between clean systems and documented findings — the same rhythm we walk every building.

Clean concrete slab surface showing smooth finish and proper expansion joints in a residential building
System Clear

8 Floors

Inspected

Concrete & Masonry

Structural Envelope

Post-tension slab performing within tolerances

No active cracking observed across all 8 floors. Expansion joints sealed correctly. No evidence of differential settlement.

SYS-001
Close-up of deteriorating waterproof membrane with visible delamination and moisture damage on a balcony
Critical Finding

94%

Moisture Reading

Envelope Integrity

Waterproofing Systems

Balcony membrane failure — Level 6, Units 601–608

Moisture meter readings of 94% at threshold transitions. Delamination visible beneath tile. Estimated repair window: 18 months before structural damage.

SYS-002
Properly insulated HVAC riser pipes in a mechanical room showing clean installation and correct hanger spacing
System Clear

12 Risers

Verified Clear

Mechanical Systems

HVAC Riser Network

Supply risers correctly insulated, no condensation bridging

All 12 vertical supply risers inspected from mechanical room to penthouse level. Insulation intact. Hanger spacing within ASHRAE 90.1 guidelines.

SYS-003
Parking deck concrete showing signs of surface carbonation and early spalling with visible rebar corrosion staining
Moderate Finding

340 sq ft

At-Risk Area

Below-Grade Structures

Parking Deck

Chloride-induced rebar corrosion — P2 Level, Grid C–F

Carbonation depth exceeds 20mm. Half-cell potential readings indicate active corrosion in 340 sq ft section. Spalling risk within 36 months without intervention.

SYS-004
White TPO roofing membrane on a mid-rise building with properly flashed HVAC penetrations and clean drain sumps
System Clear

47 Points

All Clear

Roof Assembly

Roofing Membrane

TPO membrane fully adhered, penetrations properly flashed

All 47 roof penetrations inspected. Flashings sealed within manufacturer specifications. Drain sumps clear. No ponding water evidence observed.

SYS-005
Fire sprinkler head showing escutcheon plate gap violation with visible ceiling tile displacement around the fitting
Minor Finding

23 Heads

Non-Compliant

Life Safety

Fire Suppression

Sprinkler escutcheon gap violations — Floors 3, 7, 9

NFPA 13 gap exceedance at 23 heads across three floors. Ceiling tile displacement post-renovation exposed gaps exceeding ½ inch. AHJ notification required.

SYS-006
Building inspector's gloved hand holding a moisture meter against a balcony threshold, reading moisture levels in concrete
The Detail That Changes Everything

"A moisture reading of 94% at a balcony threshold is not a maintenance note.
It is a lawsuit waiting for a rainstorm."

From Field Report BR-2024-0891 — 9-Story Condominium, San Diego

Live Reading

94% RH

Balcony threshold, Unit 601
Threshold: ≤ 75% acceptable

Client Outcomes

What boards and managers say
after the report lands.

$2.3M

Reserves Protected

"BuildingInspect found 14 documented deficiencies our original contractor never disclosed. The report stopped a board vote that would have cost us $2.3 million in misallocated reserves."

Margaret Holbrook

Board President

The Meridian, 11-Story Condo — Scottsdale, AZ

10-Year

Capital Plan Delivered

"We inherited a 1987 concrete-frame building and had no idea what we were walking into. Their report gave us a 10-year capital plan with prioritized line items. It changed how we manage the asset entirely."

David Okonkwo

Senior Property Manager

Sandpiper Residences, 8-Story — Phoenix, AZ

3 Floors

Cleared Before CO

"We were 60 days from CO when they flagged a fire suppression gap violation across three floors. We fixed it pre-occupancy. Would have been a nightmare post-sale."

Rachel Vásquez

Development Director

Casita Alta, 7-Story New Construction — Tucson, AZ

AIBD Member

Building Diagnostics

ICC Certified

Inspection Programs

ASTM E2018

Property Condition

NFPA Compliant

Life Safety Standards

Book an Inspection

Schedule Your Building
Inspection

We confirm availability within 4 business hours. Scope and pricing provided before any commitment.

Still Comparing Firms?

Download a Sample
Inspection Report

See exactly how we document findings — annotated photographs, severity ratings, repair cost estimates, and a prioritized remediation schedule.

No sales calls. Report delivered immediately.

Report Includes

47-point system checklist
Annotated field photographs
Severity-rated findings (Critical / Moderate / Minor)
Repair cost estimate ranges
Prioritized 3-year remediation schedule
AHJ notification requirements