Units Inspected
Buildings Cleared
Deficiency Detection Rate
We find what the builder left behind.
Documenting hairline slab cracks, HVAC riser deficiencies, and waterproofing failures in 5–12 story residential buildings before they escalate into seven-figure lawsuits.
Every system. Every floor.
No assumption left undocumented.
Cards alternate between clean systems and documented findings — the same rhythm we walk every building.

8 Floors
Inspected
Structural Envelope
Post-tension slab performing within tolerances
No active cracking observed across all 8 floors. Expansion joints sealed correctly. No evidence of differential settlement.
94%
Moisture Reading
Waterproofing Systems
Balcony membrane failure — Level 6, Units 601–608
Moisture meter readings of 94% at threshold transitions. Delamination visible beneath tile. Estimated repair window: 18 months before structural damage.

12 Risers
Verified Clear
HVAC Riser Network
Supply risers correctly insulated, no condensation bridging
All 12 vertical supply risers inspected from mechanical room to penthouse level. Insulation intact. Hanger spacing within ASHRAE 90.1 guidelines.

340 sq ft
At-Risk Area
Parking Deck
Chloride-induced rebar corrosion — P2 Level, Grid C–F
Carbonation depth exceeds 20mm. Half-cell potential readings indicate active corrosion in 340 sq ft section. Spalling risk within 36 months without intervention.
47 Points
All Clear
Roofing Membrane
TPO membrane fully adhered, penetrations properly flashed
All 47 roof penetrations inspected. Flashings sealed within manufacturer specifications. Drain sumps clear. No ponding water evidence observed.

23 Heads
Non-Compliant
Fire Suppression
Sprinkler escutcheon gap violations — Floors 3, 7, 9
NFPA 13 gap exceedance at 23 heads across three floors. Ceiling tile displacement post-renovation exposed gaps exceeding ½ inch. AHJ notification required.

"A moisture reading of 94% at a balcony threshold is not a maintenance note.
It is a lawsuit waiting for a rainstorm."
Live Reading
Balcony threshold, Unit 601
Threshold: ≤ 75% acceptable
What boards and managers say
after the report lands.
$2.3M
Reserves Protected
"BuildingInspect found 14 documented deficiencies our original contractor never disclosed. The report stopped a board vote that would have cost us $2.3 million in misallocated reserves."
Margaret Holbrook
Board President
The Meridian, 11-Story Condo — Scottsdale, AZ
10-Year
Capital Plan Delivered
"We inherited a 1987 concrete-frame building and had no idea what we were walking into. Their report gave us a 10-year capital plan with prioritized line items. It changed how we manage the asset entirely."
David Okonkwo
Senior Property Manager
Sandpiper Residences, 8-Story — Phoenix, AZ
3 Floors
Cleared Before CO
"We were 60 days from CO when they flagged a fire suppression gap violation across three floors. We fixed it pre-occupancy. Would have been a nightmare post-sale."
Rachel Vásquez
Development Director
Casita Alta, 7-Story New Construction — Tucson, AZ
AIBD Member
Building Diagnostics
ICC Certified
Inspection Programs
ASTM E2018
Property Condition
NFPA Compliant
Life Safety Standards
Schedule Your Building
Inspection
We confirm availability within 4 business hours. Scope and pricing provided before any commitment.
Download a Sample
Inspection Report
See exactly how we document findings — annotated photographs, severity ratings, repair cost estimates, and a prioritized remediation schedule.
Report Includes